20 t/h modified asphalt equipment — pairs with an asphalt mixing plant such as the XAP65 to produce modified asphalt on-site instead of buying pre-modified bitumen from external suppliers. Continuous production mode via two-stage colloid mill shearing and grinding for finer, more uniform modifier particle distribution than single-stage equipment. 212 kW required operating power. 6.5×2 m² production tank capacity. 11.5 m × 2.25 m × 2.5 m transportation dimensions — within standard road transport envelope. Automatic and manual control modes. Suited for highway construction crews and highway maintenance contractors.
The XCMG XJ20 is a 20 t/h modified asphalt equipment unit — pairs with an asphalt mixing plant (such as the XAP65) to produce modified asphalt on-site instead of buying pre-modified bitumen from external suppliers. Continuous production mode via two-stage colloid mill shearing and grinding.
The two-stage colloid mill cuts the modifier particle size smaller and holds particle distribution more uniform than single-stage equipment — concrete control over modified asphalt quality and stability, useful for highway maintenance and construction projects where modified-asphalt mix specs vary across pavement classes. 6.5 m × 2 production tank capacity (m² source spec). 212 kW required operating power. 11.5 m × 2.25 m × 2.5 m transportation dimensions — sits within standard road transport envelope, mobilizes by single trailer load. Automatic and manual control modes. Suited for highway construction crews and highway maintenance contractors producing modified asphalt directly at the mixing-plant site rather than relying on external bitumen suppliers.