RIM DB-180(Dam formwork system) Home>Service>Building formwork>Formwork systems |
The RIMMCA DB formwork system with high dependability and loading capacity for mass concrete structures.
The formwork system with high dependability and loading capacity for mass concrete structures, such as dams, barrages, run-of-river power stations, navigation locks and etc..
Advantages:
1. High loading capacity.
2. Formwork tie rod is not necessary.
3. 3 levels platform and panel are connected together, lifted in one unit.
2. Formwork tie rod is not necessary.
3. 3 levels platform and panel are connected together, lifted in one unit.
4. The formwork is tiltable and can be rolled back on the bracket.
5. Two different platform widths, two types of loadability platform, meet all project requirements.
5. Two different platform widths, two types of loadability platform, meet all project requirements.
Dam Formwork DB180:
1. Panel can be retracted 15cm.
2. Platform width:
up platform, 1.2m
main platform, 1.8m
suspension platform, 1.2m
3. Concrete pouring height up to 3.0m.
4. Tensile forces of the anchor up to 150KN.
2. Platform width:
up platform, 1.2m
main platform, 1.8m
suspension platform, 1.2m
3. Concrete pouring height up to 3.0m.
4. Tensile forces of the anchor up to 150KN.